DG06 Lansing, MI

DG06 Lansing, MI

DG06 Lansing, Michigan, is the first data centre in Deep Green's substantial pipeline of capacity across the United States.

Consistent with our mission, DC06 is being built into the former Cooley Law School Campus, and will supply free heat energy to the Lansing Board of Water and Light hot water system.

DG06 Lansing, Michigan, is the first data centre in Deep Green's substantial pipeline of capacity in the United States.


Consistent with our mission, DC06 is being built into the former Cooley Law School Campus, and will supply free heat energy  to the Lansing Board of Water and Light hot water system.

20+

MW

20+

MW

20+

MW

6000+

SqM

6000+

SqM

6000+

SqM

Colocation

Hosting

Colocation

Hosting

Colocation

Hosting

Air to immersion

Cooling

Air to immersion

Cooling

Air to immersion

Cooling

The details

DG06 Lansing will use state-of-the-art tri-density heat removal infrastructure, with Rear Door, Direct-to-Chip, and Immersion cooling systems, supporting up to 400-600 kW+ per chassis next-generation GPU installations.

The facility will transport heat energy to the Lansing Board of Water and Light On-Campus Heat Exchange platform, saving $1.78million of costs and avoiding 14.12k tCO2 in Scope 1 emissions every year. 

General

Number of data floors: 1

Separate delivery bays: 4 modules

Target PUE: <1.17

Containerised

100 racks per module

Up to 600kW/rack

Networking

Fully deployed Internet Exchange and Cloud Ramp with diverse fibre routes.

Low-latency carrier-neutral scalable 800Gb connectivity

Connected Carriers: 10+

Fire detection & Suppression

Novec Pre-action Fire Suppression System

Security

Electronic Access Control: 7 Tier Security Perimeter with 2-Form Biometric controlled access security system. 

Fully integrated internal and external CCTV, Audited

24/7 Security / Facility Operations Control Center: Staffed 24*7 * 365 with facility-wide integrated CCTV Monitoring meeting SOC2, ISO 27001, FEDRAMP Medium Controls and NIST-53 standards

Power

Total incoming feed capacity (kVA): 24MVA

Available power: 20 kW

Generator fuel at full load (hours): 240

UPS (minutes): 5

UPS redundancy: N+1

Generator redundancy: N+1

Cooling: N+1 (Heat reuse, Expansion chillers & Air Cooled Free Cooling Chiller)

Interested in capacity at Lansing?

Interested in capacity at Lansing?

Interested in capacity at Lansing?