BUILDING A
BETTER FUTURE.

We can provide free heat to District Heating Systems, at scale, across the UK.

We are currently seeking 1500 hosts across the UK to heat their pools and leisure centres with a Deep Green data furnace.

Key benefits to you.

Free energy

7.5 GWh

Free energy per year

Lower costs

£975k

Annual savings

Lower carbon impact

2,000 tCO2e

Annual carbon savings

How it works – the partnership.

We take care of everything.

We pay to install and maintain the unit, including the cost of any fabrication changes. We pay you for the power we draw. We pay for the network connectivity to and from your site. If we agree to use a containerised solution, we pay for that too. We provide free heat in return for the space and cool water. We can even report your CO2 emissions savings, making one aspect of your ESG reporting a simple pleasure.

Do you qualify?

Power

We need at least 250kVA of headroom in the site’s power supply to install a Deep Green data centre. We work with you to understand your existing capacity and the pathway to securing additional power if required.

Space

Our data centres scale from the size of a chest freezer placed in the fabric of your plant room, to modular units on hardstanding  within your estate perimeters. A site survey determines what we can build, where, and its contribution to your energy and carbon savings.

Network

Our data centres need high speed connectivity to run.  We will survey the existing network and take responsibility for any upgrade required.

What’s the process to secure a furnace?

1. Qualification

We’ll collect details about your site(s) to assess viability for an install. This will include asking you to send us information about the power availability and usage and conducting a site visit.

2. Proposal

We’ll collect details about your site(s) to assess viability for an install. This will include asking you to send us information about the power availability and usage and conducting a site visit.

3. Legals

We supply all documentation to agree the partnership for the supply of free heat to your site.

4. Design & Build

Once signed off, our teams will draw up the final designs and, subject to all necessary permissions, the build will commence. Our modular design means the build causes minimal disruption to the site.

Are you ready for free heat?